翻訳と辞書
Words near each other
・ JSSR
・ JST
・ JST connector
・ JStar
・ Jstarh
・ JStart
・ JStik
・ JSTOR
・ JSTV
・ JSU
・ Jsu Garcia
・ JSV
・ JSW
・ JSW Barmer Power Station
・ JSW Cement
JSW Energy
・ JSW Group
・ JSW Infrastructure
・ JSW Ispat Steel
・ JSW Ratnagiri Power Station
・ JSW Steel Ltd
・ JSW Vijayanagar Power Station
・ JSwat
・ JSX Composite
・ JSY
・ JSyn
・ JSYU UAV
・ JT
・ JT (album)
・ JT (visualization format)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

JSW Energy : ウィキペディア英語版
JSW Energy

JSW Energy Limited (JSWEL) (|) is a division of JSW Group in India.
JSW Energy is in various areas of power: Generation, Transmission and Trading.
==Power Plants==
JSW Energy has 3740 MW of operational generating capacity. In addition, it has power generation projects at an early stage under development with a proposed combined installed capacity of 8630 MW.
* JSW Vijayanagar Power Station, Toranagallu village in Bellary district, Karnataka. It is a 1460 MW (2x130,4x300 MW) plant.〔http://www.jsw.in/Energy/inner_subpage.php?id=1&mid=2sid=4#projectunderoperations〕
* JSW Ratnagiri Power Station, Nandiwade village near Jaigad in Ratnagiri district, Maharashtra. It is a 1200 MW (4x300 MW) plant.〔http://www.jsw.in/Energy/inner_subpage.php?id=2&mid=2sid=4#projectunderoperations〕
* JSW Barmer Power Station, Bhadresh village in Barmer district Rajasthan. It is a 1080 MW (8x135 MW) plant.〔http://www.jsw.in/Energy/inner_subpage.php?id=3&mid=2sid=4#projectunderoperations〕
*JSW Energy,controlled by billionaire Sajjan Jindal, has acquired two of Jaiprakash Power Ventures’ hydro power plants, with a combined capacity of 1,391 Mw, for Rs 9,700 crore.
The board of directors of Jaiprakash Power Ventures, a fully owned subsidiary of the Jaypee group, has approved the 100 per cent transfer of businesses of its operating power plants — the 300-Mw Baspa-II hydroelectric plant (commissioned in 2003) and the 1,091-Mw Karcham Wangtoo plant (commissioned in 2011), in Himachal Pradesh.JMD Sanjay Sagar heading JSW energy.operating from mumbai corporate
Jaypee’s entire hydropower portfolio of three plants was up for sale. Of these, JSW has bought two with an asset value of 50 years. Since the acquired capacity is operational, this deal would add to JSW’s generation capacity, revenue, PAT (profit after tax) and Ebitda (earnings before interest, tax, depreciation and amortisation). With a total hydro asset base of 1,300 Mw, JSW is now the largest private producer of hydro power in the country.